Jump to content

Signal Mountain Eagles


SCtribe
 Share

Recommended Posts

The new school in Hamilton County figures to be in the Single A (Under 400 Students) or Double AA (400 - 666 Students) classification. Like many new schools the football team will not be eligible for the playoffs in 2008 as they will be competing with a JV/Varsity schedule. The new football stadium will be built in phases and is expected to hold 1800 fans, have a track, and a field house with a 1400 hundred square foot weight room. The playing surface on the football field may be synthetic turf. The cost of the stadium is estimated to be between 1.8 - 2.4 million dollars. Nearly 90,000 dollars will be set aside for equipment/uniforms etc. With all this being said. Who will the new coach be? An announcement is expected in December. This looks like a possible gold mine for someone as students from Red Bank are expected to be rezoned. Any solid information on candidates will be appreciated.

 

BTW-All the information I have used in this post can be viewed at www.signalmountainhighschool.com

Link to comment
Share on other sites

  • Replies 23
  • Created
  • Last Reply

Top Posters In This Topic

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

Announcements


×
  • Create New...